by | Mar 1, 2017
Hammer Reservoir – Thornton, Colorado American West Construction installed 1900 feet of perforated groundwater drain pipe, six 48 inch drain manholes, and one 72 inch flow meter manhole with electrical, instrumentation and control system. The system included an...
by | Feb 1, 2017
McIntosh Lake – Longmont, Colorado Starting with manhole #1, at approximately 25’ deep of excavation a new 90” diameter manhole was installed with a 48” diameter Hobas pipe. Existing 24” diameter VCP pipe was removed. At approximately 250’ of outlet works pipe,...
by | Jan 26, 2017
Kenwood Outfall Storm Sewer and Roadway Improvements, Phase 1 – Commerce City, Colorado In October 2016, Urban Drainage and Flood Control District (UDFCD) contracted with American West for the construction of the improvements associated with Kenwood Outfall in...
by | Jan 26, 2017
Forest Hill Road – Evergreen, Colorado Jefferson County Road & Bridge Division contracted with American West Construction through FEMA funding to complete the following items on SH-74 & Forest Hill Road in Evergreen, Colorado. Repair existing slope and...
by | Jan 26, 2017
I-70 Hamilton Gulch Culvert Work In September 2016, AWC did culvert work for CDOT at Hamilton Gulch. The work consisted of slip-lining a culvert under I-70 that conveyed water from Hamilton Gulch from north to south. The culvert consisted of two different sized pipes...