Erie Highlands

Erie Highlands – Erie, Colorado Continuation of Filings. 6,597’ LF of sanitary sewer, 2,203’ LF of RCP storm sewer, 5,804’ LF of watermain (103 services each) and 11,253’ LF of curb drain. 1 concrete forebay was installed by subcontractor (MLL Inc.) Beers...

Cottonwood Highlands Sewer Outfall

Cottonwood Highlands Sewer Outfall – Parker, Colorado Drainageway installation requiring over 1,527 CY of boulders / riprap for 7 drop structures (with concrete cutoff walls / thickened edges), 1,550 LF of boulder wall concrete trickle channel and over 200 LF of...

McIntosh Lake

McIntosh Lake – Longmont, Colorado Part 1: Starting with manhole #1, at approximately 25’ deep of excavation a new 90” diameter manhole was installed with a 48” diameter Hobas pipe. Existing 24” diameter VCP pipe was removed. At approximately 250’ of outlet...

Kenwood Outfall Storm Sewer and Roadway Improvements, Phase 1

Kenwood Outfall Storm Sewer and Roadway Improvements, Phase 1 – Commerce City, Colorado In October 2016, Urban Drainage and Flood Control District (UDFCD) contracted with American West for the construction of the improvements associated with Kenwood Outfall in...

Forest Hill Road

Forest Hill Road – Evergreen, Colorado Jefferson County Road & Bridge Division contracted with American West Construction through FEMA funding to complete the following items on SH-74 & Forest Hill Road in Evergreen, Colorado. Repair existing slope and...